Improvement Of Low Pressure Water Pumping System And Laying Raw Water Pipelines Ban Kluay Low Voltage Station Ready To Improve The Production System From 300 Cubic Meters/Hour To 450 Cubic Meters/Hour And Improve The Production System From 100 Cubic Meters/Hour To 150 Cubic Meters/Hour. Khok Samrong Water Production And Distribution Station. To Increase The Amount Of Water Sold Provincial Waterworks Authority, Ban Mi Branch, Khok Samrong Subdistrict, Khok Samrong District Lopburi Province