Hiring Of Motor Cab With Engine Capacity Less Than Or Equal To 2000 Cc With (Non-Air Conditioned Of Petrol/Diesel Driven With Driverfor Use Of The Office Of Theexecutive Engineer, Investigation Unit, Phe Dte. For The Period Of (06/01/2026 To 30/06/ 2026) = 176 Days.