Feasibility Study And Detailed Project Report For Elimination Of Level Crossings With Road Over Bridge At L-Xing No. Nj/25(Km29/3-4) (Ncbd-Jdgp) & Nn/104 (Km.164/5-6, Smta-Kamg), Nn/110 (Km.173/3-4, Joq-Srpb) & Sk/141 (Km.134/0-1, Has-Kcf), Sk/162 (Km.93/1-2, Crx-Bnq), Sk/196(Km39/5-6, Svq-Brq), Ab/1(Km.2/6-7, Apdj-Apd), Ab/3(Km.4/9-5/0, Apdc-Apd), Ab/13(Km.14/1-2, Apd-Bsw), Ab/22(Km.26/1-2, Ncb-Cob) Ab/26(A) Km.30/0-1,Cob-Dwt), Ab/32(Km.37/5-6,Dwt-Vtg)And L-Xing No. Ab/47(Km.49/5-6, Vtg-Dhh), (Total 13 Nos.) Under The Jurisdiction Of Aden/Ii/Ncb, Aden/East/Apdj, Aden/West/Apdj, Aden/Mbz & Aden/Hq/Apdj Of Apdj Division.