Carrying Out Falling Weight Deflectometer (Fwd) Test And Other Necessary Field Works And Calculations, Structural Evaluation Of Pavement By Cutting Pit With Photograph (And Filling Of The Excavated Pit), Conducting Traffic Census For A Continuous Period Of 7 Days (7 X 24 Hrs), Drone Shoot Videography Throughout The Road, Axle Load Survey (At Least 3 Days) And Submission Of Dpr (6 Copies) In Connection With Bishnupur-Kotulpur Road From 0.00 Kmp To 18.00 Kmp, Strengthening Work Under Bishnupur Division, P.W.Dte In The District Of Bankura During The Year 2026-27