Construction Of High Level Bridge Skew 3 Span 13.0M Each Eff. Over Lisara Drain X-Ing Bbm Road To Rampura Pitho Chowke At Rd 6700 Including Its Approaches,Road Diversion,Dismantling And 2.5M High Rcc Retaining Wall Under Pmgsy-Iii(Batch-1)