1066 Bs 01/01 - Assignment Of The Verification Service Of The Final Project And Executive Project, Following The Assignment Of An Integrated Contract, Drafted With The Adoption Of Methods And Tools Of Digital Construction Information Management (Bim), Relating To The Works Of Adaptation To The Presidential Decree. N. 230/2000 And Expansion Of The Accommodation Capacity To Be Carried Out At The Verziano (Bs) House Of Recclusion.