1) Widening Of Cuttings In Semi Ghat Section From Km 319/0 To 321/0=2.0 Km Up Side To Avoid Boulder Falling On Track In Dd-Kwv Section (Total=2.00 Km) And Provision Of Side Drain Under Aden(Bg)Kwv. 2) Widening Of Cuttings From Km 548/8-549/9 =1.1Km Up Side , From Km 557/850-558/150 =0.3Km Up And Dn (Total 0.6Km) ,From Km 564/050-564/550 =0.5Km Up Side, (Grand Total 2.2Km) To Avoid Boulder Falling On Track In Kui-Wd Section And Provision Of Side Drain Under Aden/Klbg.