Design services for the development of the execution project on the topic: Repair of the road sector from Valea Babei Street (street-170 m.l.), Boris Zavatin Street (street- 1250 m.l., side access- 500 m.l.), bilateral sidewalk from Tudor Vladimirescu Street 111 to Dumbrăvii Street (475 m.l.), Mihail Sadoveanu Street- Hărtoape Street (street- 420 m.l.), Mircești Street (street- 725 m.l., side access- 400 m.l.) Stejarului Street (including Valea Babei Street sector no. 2 to no. 4 (street- 740 m.l., access- 150 m.l.) Balkani Street- 4 Balcani Street (street- 460 m.l.), Mircești Street- la Biserici Street (street- 1100 m.l., side access- 80 m.l.), 3 Vovințeni Street from no. 1 to no. 7, 2 Vovințeni Street (street- 315 m.l., side access- 100 m.l.), Durlești city