Continuation Of Csb Construction Work Including Incinerator, Wells And Solar Energy For The Supply Of The Water Tower (Revival) Divided Into Two (02) Lots: - Lot 01: Continuation Of Construction Work Of Csb Sambava, Sambava District, Sava Region Including Incinerator, Wells And Solar Energy For The Food Of The Castle (Recovery); - Lot 02: Continuation Of Construction Work Of Csb Agnalamare, Ambovombe District, Androy Region Including Incinerator, Wells And Solar Energy For The Supply Of The Water Tower (Revival).