This Project Aims To Improve The Accessibility And The Renewal And Improvement Of The Services, The Technical Definition And The Economic Assessment Of The Proposed Action. The Project Also Encompasses The Work Of Repainting The Signaling Of The Parking Area On The Asphalt And The Works Of The Sanitation Network That Affect The Final Section Of The Street, From Matagalls Street To Av. From September 11. The Total Scope Of The Action Is 3,982.50 M2, Of Which 2,562 M2 Correspond To The Urbanization Of Sidewalks And Roads Between Pompeu Fabra Avenue And Calle Del Matagalls And The Remaining 1,420.50 M2 Correspond To The Area Of Replacement Of The Central Collector And The Associated Works Of Milling And Asphalted.