Construction Of The Kolnik -Elbląg Gas Pipeline With The Infrastructure Necessary For Its Operation On Area Of The Pomeranian And Warmian-Masurian Voivodeship Implemented As Part Of The Project Entitled "Construction Kolnik Gas Pipeline- Elbląg With The Gasification Of The Vistula Spit "